In New Zealand, a BWOF (Building Warrant of Fitness) and a compliance schedule are essential components of the Building Act 2004 that relate to the ongoing safety and functionality of commercial buildings (and certain multi-unit residential buildings). Compliance ScheduleA compliance schedule is a document issued by the local territorial authority (usually your city or district council) when:
BWOF (Building Warrant of Fitness)The BWOF is a certificate the building owner must issue annually to:
When Fire Alarm Monitoring Is RequiredWhilst all building owners should have their fire alarm systems monitored in their buildings, some buildings require it. Fire alarm monitoring is typically required if the building has a "Type 4" fire alarm system — an automatic fire detection system with alarm monitoring — and any of the following apply: 1. It is required by the Building Code or Fire Engineer’s design
Implications for the BWOFIf fire alarm monitoring is included in the compliance schedule as a specified system (usually under SS2 – Automatic or manual fire alarm systems), then:
We're here to HelpIf you require fire alarm monitoring for your building contact us today and we'll be happy to help.
Comments are closed.
|
BlogWe'll post info here relevant to the industry. Mostly about happenings, technology, our products, and services. Register, or follow us on social media, for updates. Archives
April 2025
Categories
All
|